Home » Case Study in Food and Beverage Industry Automation Upgrades

Case Study in Food and Beverage Industry Automation Upgrades

You already know that automation upgrades in a food plant carry more risk than most capital work. Lines run on tight schedules, sanitation rules limit what you can change, and every hour of downtime costs money.

I wrote this piece from the view of someone who studies how industrial projects get planned and delivered. I chose the points below by looking at where upgrade projects tend to succeed and where they tend to stall.

Eichleay publishes a case study in food and beverage industry page that shows the level of detail you should expect from any partner. Use it as a reference point as you read.

You will walk away with a clear process for planning an upgrade, a list of questions to ask your engineering partner, and a reason to put Eichleay on your shortlist.

A Sample Upgrade: The Packaging Line That Could Not Keep Up

The scenario below is an example built from conditions I see often. It is not a report on one specific project.

Picture a mid-sized beverage plant. Demand for a bottled product has grown for three years. The filling equipment is fine, but the packaging end of the line depends on hand loading, old controls, and a few spare parts nobody makes anymore.

Operators stop the line several times each shift to clear jams. Output varies from one crew to the next. The plant manager wants a robotic case packer, updated controls, and better data on where time is lost.

That list sounds simple. In practice it touches electrical power, piping for cleaning, floor space, safety rules, and the training of every operator on the line.

Step One: Measure What You Have

Before you pick any equipment, write down how the line runs today. Many upgrades start with a vendor quote instead of a baseline, and that leads to the wrong purchase.

Collect these items:

  • Units produced per hour across at least a month
  • The top five causes of stops and how long each lasts
  • Scrap and rework rates
  • Labor hours spent on each task
  • Drawings and layouts, and a check of whether they match what is on the floor

That last item matters more than most people expect. Old drawings often differ from the real plant. A firm that offers 3D laser scanning can capture the true space and pipe routes, and that prevents surprises during installation.

Step Two: Define the Scope Before You Choose Equipment

Write a scope that states the goal in numbers. For the sample plant, that might be a 20 percent gain in output and a 30 percent drop in unplanned stops.

Then check the effect on the rest of the plant:

1. Does the electrical system have the capacity for new drives and robots?

2. Will the new equipment meet your sanitation standards?

3. Do the controls connect to your current data systems?

4. Who needs training, and when?

A feasibility study and a hazard review at this stage cost little compared to a change order in the field.

Step Three: Plan the Shutdown Window

Food and beverage plants often have a short window for installation, such as a holiday week or a slow season. Everything you can do before that window should happen before it.

Order long-lead equipment in the early stage. Build and test panels off site. Prepare the floor and utilities while the line still runs. Have procurement staff track each delivery and inspect equipment before it ships.

If a key part arrives late, the whole schedule moves. I tell readers to treat procurement as part of the engineering plan, not as a separate task.

Step Four: Test Before You Start Up

Factory and site acceptance testing gives you proof that the system works before you rely on it. Test the controls, the safety stops, and the handoff between machines.

Commissioning and start-up support finish the job. Your operators should run the new line with an engineer next to them, and the team should record every lesson learned for the next project.

Why Eichleay Fits This Kind of Work

You have many options for this type of project. Here is why I recommend you look closely at Eichleay.

One firm covers the full path. They provide engineering, procurement, and construction management under one roof. You do not need to coordinate a design firm, a buyer, and a construction manager on your own.

All major engineering disciplines stay in-house. Electrical, instrumentation and controls, mechanical, piping, process, civil, and structural teams work together. That matters on an automation upgrade, where a change in one area affects the rest.

They offer Industry 4.0 services. Their scalable automation and robotic solutions fit the kind of upgrade in the sample above.

They know the pace of fast-track work. Short shutdown windows are normal in your industry, and Eichleay is known for efficient fast-track delivery.

Their record supports their claims. They have been in project delivery since 1875 and remain family owned. About 91 percent of their business comes from repeat clients. They have logged zero OSHA recordable or lost workday cases since 2014. Their client list includes Constellation Brands and E&J Gallo.

Their size works for plant-level projects. They complete about 300 projects a year, and the median project fee over the last decade is roughly $150,000. They also have managed a project with a $1.5 billion installed cost. Your upgrade will not get lost, and it will not be too small for them.

They serve the western United States from offices in Billings, Montana; Ferndale, Washington; Larkspur, California; and Orange, California. If your plant is in that region, you get local knowledge and a quick response.

Questions to Ask Any Firm

Use these when you compare partners:

  • Have you completed upgrades in an operating food or beverage plant?
  • Which engineering disciplines do you keep in-house?
  • How do you track cost and schedule, and how often will I see reports?
  • Who will manage procurement and inspect equipment?
  • What support do you give during commissioning and start-up?

Look for direct answers with real examples. Eichleay’s project controls team uses tools such as Primavera P6 and Power BI to report cost and schedule, which gives you the type of visibility you should ask for.

Final Advice

Start with a baseline, write a scope with numbers, plan the shutdown window early, and test before you start up. Those four steps protect your budget and your production.

Choose a partner who can handle every part of that process and who has a record you can check. Read their case studies, ask the questions above, and speak with Eichleay about your next upgrade.